[01/06/2022| 10:00 AM]
• Power outage currently experienced on site, building is currently running through a power generator.
BENECO has an ongoing repair of their transformer that affects the electricity at Emapta Pilando Center Building.
[01/06/2022| 4:10 PM]
Please be advised that the main power has been restored at Emapta Pilando Center Baguio around 4:10 PM today, Wednesday, June 1, 2022.
All network devices are currently operational. No alerts relating to the power outage have been observed. The power supply for the building has been stable since it was restored.