[0n6/10/2022 | 4:31 AM]
• Please be advised that the maintenance has been completed successfully, we have checked the affected circuit, and has been proven operational. IPLC and VPC latency are within the normal range.
[03/06/2022 | 1:53 PM]
•Our service provider will perform the activities and some channels will be reconfigured.
•During the maintenance window, our service provider has advised us of an expected impact of 50ms switch hits within the change window.