22nd August 2022

Power Ticket#10163585 | August 22, 2022 | NTB | Unplanned power outage

[08/23/2022 | 9:10 PM PHT] • Please be advised that Neutrinus Building main power was back around 8:54 PM PHT. We are still in coordination with the Building admin in NTB to get the root cause of this power interruption.

[08/22/2022 | 7:56 PM PHT] • Please be advised that there is an unplanned power outage on Neutrinus Building Baguio around 7:06 PM today. The building is currently running on a power generator