[09/06/2022 | 1:55 PM PHT]
• As part of our continuous effort to provide service reliability, we filed a change request to conduct an Infrastructure Risk Analysis and Mitigation Plan at JKB Building Makati on September 10, 2022 (Saturday) from 12:00 PM to 2:00 PM. The purpose of the activity is to simulate BCP failover testing on our site. The whole site will be experiencing intermittent LAN and internet connectivity during the maintenance period.
[09/10/2022 | 2:00 PM PHT]
Please be advised that our activity has been completed successfully, All connection and network devices have been tested and confirmed operational.