[09/14/2022 | 6:16 PM PHT]
• As part of our continuous effort to provide service reliability, we filed a change request to conduct an Infrastructure Risk Analysis and Mitigation Plan at Orient Square Building (OSB), Ortigas on September 24, 2022 (Saturday) from 12:00 PM to 2:00 PM. The purpose of the activity is to simulate BCP failover testing on our site. The whole site will be experiencing intermittent LAN and internet connectivity during the maintenance period.
• [09/24/2022 | 2:27 PM PHT]
Please be advised that our activity has been completed successfully, All connection and network devices have been tested and confirmed operational.