[17/10/2022 | 6:19 PM]
• Please be advised that our activity has been completed successfully. All connections and network devices have been tested and confirmed operational.
[8/10/2022 | 6:52 AM]
• As part of our continuous effort to provide service reliability, we filed a change request to conduct an Infrastructure Risk Analysis and Mitigation Plan at JMT Corporate Condominium, Ortigas on October 15, 2022 (Saturday) from 12:00 PM to 2:00 PM. The purpose of the activity is to simulate BCP failover testing on our site. The whole site will be experiencing intermittent LAN and internet connectivity during the maintenance period