• Event: Building Power Outage.
• Unscheduled: November 21, 2022 (Monday) | 1:09 PM – 1:54 PM (PHT)
• Details: The building main power line is now back on its normal operation as of 1:54 PM (PHT).
• Result: Recovered
• Event: Building Power Outage.
• Unscheduled: November 21, 2022 (Monday) | 1:09 PM (PHT) - Ongoing.
• Details: There is an ongoing power outage at NTB site and we are still in coordination with the building admin to know the details of the power outage. Currently, the building supply is running on genset.
• Service Impact: Partial Impact on Building Power Supply