• Event : Electrical Preventive Maintenance at IBM
• Schedule : September 1-3, 2023 - Ongoing
• Activity Details : Our building administrator in IBM Office will be conducting an Annual Preventive Maintenance and replacement of Automatic Transfer Switch (ATS).
During the maintenance window, a power outage is expected. Due to loss of power onsite, Network Connectivity will be impacted as well.
• Status: Completed