• Event: Monthly Load Testing for Generators
• Schedule: April 5, 2025 (Saturday) | 11:15 AM to 11:45 AM (PHT)
• Activity Details :
Please be informed that the SM Mega Tower Building Administration has scheduled a monthly load testing of the generators. The transition from normal to emergency power will occur around 11:15 AM-11:20 AM, and from emergency back to normal between 11:40 AM-11:45 AM.
Further, sharing the next schedule of the monthly genset load testing:
April 5, 2025 (Saturday) | 11:15 AM to 11:45 AM (PHT)
During the maintenance, Elevator access will be restricted, and the Air Conditioning system will be temporarily down prior to each power transfer, elevator operations will resume once the power supply stabilizes.
While we do not anticipate any impact on network and internet connectivity due to the availability of uninterruptible power supply (UPS) serving as backup power for our network devices, devices without battery support, such as desktops, lighting, and other equipment, may experience fluctuations.
Thank you for your understanding.
• Service Impact : Brief Power Interruption at SMT – SM Mega tower