• Event: Power Shutdown
• Scheduled Start: April 16, 2025, Wednesday (08:00 PM) (PHT) • Scheduled End: April 20, 2025, Sunday (3:00 PM) (PHT)
• Activity Details:
Please be advised that the BDO Equitable Tower (BET) Building Administration will be conducting its annual preventive maintenance to inspect electrical systems and perform necessary recalibration of electrical accessories.
During this period, the building’s main power supply will be affected. A backup generator will be available only in 4th floor; however, it will operate only within the window of 6:30 AM to 7:00 PM.
Schedule & Impact:
📅 April 16 (8:00 PM) – April 20 (3:00 PM) Affected Areas: All Floors. Elevator Impact: All elevators will be non-operational during the maintenance period. Power Impact: The backup generator will operate only in 4th Floor from 6:30 AM to 7:00 PM daily. Network Impact: Minimal to no impact is expected on network devices.
For any concerns or assistance, please reach out to:
📌 Facilities and Admin – Available onsite at the 4th floor lobby for in-person assistance. 📌 IT Support – Reach out via email at helpme@emapta.com for technical concerns.
• Service Impact: Building Power Supply
• Status: Completed