• Event: Relocation of Fiber Optical Cable
• Schedule: May 22, 2025 (Thursday) | 05:59 AM – 12:00 PM (PHT)
• Activity Details:
Please be informed that our service provider will be performing a maintenance to relocate fiber optical cable that host our circuit.
During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.
• Service Impact: Latency Increase on IPLC VPC
• Status: Completed