28th May 2025

#SR-225454 | June 04, 2025| IPLC Connectivity Maintenance, scheduled 1 month ago

• Event: Cable System Replacement

• Schedule: June 04, 2025 (Wednesday) | 05:00 AM – 12:00 PM (PHT)

• Activity Details:

Please be informed that our service provider will be replacing the existing cable system between Lyon and Marseille route.

During the maintenance window, a maximum of 3-hour interruption on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Service Interruption in IPLC Connectivity

• Status: Completed