23rd June 2025

#SR-243247 | June 25, 2025 | IPLC Connectivity Maintenance, scheduled 3 weeks ago

• Event: Relocation of Fiber Optical Cable

• Schedule: June 25, 2025 (Wednesday) | 05:00 AM – 12:00 PM (PHT)

• Activity Details:

Hi Team,

Please be informed that our service provider will be performing maintenance to relocate the fiber optical cable that hosts our circuit.

During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Latency Increase on IPLC VPC

• Status: Completed