• Event: Relocation of Fiber Optical Cable
• Schedule: June 25, 2025 (Wednesday) | 05:00 AM – 12:00 PM (PHT)
• Activity Details:
Hi Team,
Please be informed that our service provider will be performing maintenance to relocate the fiber optical cable that hosts our circuit.
During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.
• Service Impact: Latency Increase on IPLC VPC
• Status: Completed