All systems are operational

Past Incidents

23rd October 2022

Ticket#10176362 | October 23, 2022 | TIM Data Center | Monthly Load Testing of Generator Sets, scheduled 2 years ago

[19/10/2022 | 6:36 AM] • One of our Data Centers will perform Monthly load testing of Generator Sets from 8:40 AM on October 23, 2022, to 5:25 PM on the same day. This maintenance aims to keep power generators running at peak efficiency and reliability. No services will be interrupted during the maintenance.

[23/10/2022 | 12:05 PM] • Data Center monthly load testing of Generator Sets has been completed successfully.

Ticket#10175825 | October 23, 2022 | SFS | Network Service Provider Maintenance, scheduled 2 years ago

[17/10/2022 | 12:45 PM] •Please be advised that due to an ongoing construction, one of our third-party service provider will be implementing a rerouting of fiber optics. Their technical team will do an emergency activity on October 23, 2022, at 12 midnight due to an affected fiber route, which is vulnerable to being cut off. •Expected impact will be a sixty (60) minute downtime within the maintenance window. •During the maintenance window, another uplink will still active and the impact onsite should be minimal.

[23/10/2022 | 6:00AM] • Maintenance has been completed as scheduled.

19th October 2022

Ticket#10176643 | October 20, 2022 | SFS | Degraded Network Performance

[20/10/2022 | 6:45AM] • Please be advised that we have monitored some network performance issues at our St. Francis Square office. We have reported this to our service provider for checking and are currently awaiting feedback.

[21/10/2022 | 4:56AM] Please be advised that one of our datacenter uplinks is now stable, while the other is still degraded. This had already been scheduled for repairs. The current onsite impact is minimal because we have another uplink going to another Data Center that is already stable. If you are experiencing issues with internet connectivity, please submit a ticket to helpme@emapta.com and we will respond as soon as possible.

[23/10/2022 | 1:44AM] • Please be advised that the detected degraded circuit has now been restored. Full network connectivity is seen in operation at St. Francis Square as confirmed by our testing.

Ticket#10176509 | October 19, 2022 | GDB | Network Connectivity Outage

[21/10/2022 | 4:43 PM] • .Please be advised that our Angeles site's uplink has been restored around 2:30 PM MNL (October 21, 2022). We will continue to monitor the circuit's stability. We will contact our ISP in order to get the official RFO of this incident.

[19/10/2022 | 4:17 PM] •Please be advised that the uplink at our Angeles site is currently monitored to be down. We have raised the issue to our Internet Service Provider for further investigation. •Further updates will be provided when available.

[19/10/2022 | 11:09 PM] •Please be advised that we are still following up with our Internet Service Provider regarding this issue. •Rest assured that we are closely looking into this and following up with utmost urgency. •Thank you for your patience.

[20/10/2022 | 7:56 PM] Please be advised that our Angeles site's uplink is still down. Our service provider was still working with a third-party partner to physically inspect and troubleshoot the affected circuit.

Ticket#10174651 | October 19, 2022 | IPLC Connectivity Maintenance, scheduled 2 years ago

[20/10/2022 | 11:50 AM] •Please be advised that the maintenance has been completed successfully. All affected circuits have been proven operational.

[11/10/2022 | 2:00 PM] • Please be advised that there will be a scheduled maintenance on October 18, 2022, to be conducted by one of our Internet Service Providers. The maintenance window will be from 12:00 AM to 3:00 AM (PHT). • Our service provider will be performing a fiber diversion work. • During the maintenance window, our service provider advised us of an expected impact of 50ms switch hits plus loss of protection within the change window.

18th October 2022

Network and Internet Ticket#10176149 | October 18, 2022 | SFS | Unplanned | Partial Network Outage at St. Francis Square

[18/10/2022 | 10:51 AM] • Please be advised that we have monitored one of our circuit uplinks to the Data Center in St. Francis Square as down. We have already alerted our service provider to this and are awaiting their reply. We are expecting the minimal impact on this outage as we have another uplink available to a different Data Center.

[18/10/2022 | 04:51 PM] • Please be advised that the affected circuit is now confirmed to be operational for almost an hour. We will continue to monitor for the links stability. • Further updates shall be provided as soon as they are available.

Ticket#10174649 | October 18, 2022 | IPLC Connectivity Maintenance, scheduled 2 years ago

[18/10/2022| 5:58 AM] • Please be advised that the maintenance has been completed successfully, we have checked the affected circuit, and has been proven operational.

[11/10/2022| 1:53 PM] • Please be advised that there will be a scheduled maintenance on October 18, 2022, to be conducted by one of our Internet Service Providers. The maintenance window will be from 12:00 AM to 3:00 AM (PHT). • Our service provider will be performing a fiber diversion work. • During the maintenance window, our service provider advised us of an expected impact of 50ms switch hits plus loss of protection within the change window.

17th October 2022

No incidents reported

16th October 2022

Ticket#10175632 | October 17, 2022 | Multiple Site | ETP to TIM Datacenter link maintenance, scheduled 2 years ago

[10/15/2022 | 3:04 PM] •Please be advised that we have just received a notice from our service provider that they will be conducting emergency maintenance on October 16, 2022, Sunday from 2:00 AM to 3:00 AM (PH Time). There will be a Forty-five (45) minute service interruption within the maintenance window affecting network traffic passing through the data center link between TIM and ETP Datacenter.

[10/15/2022 | 11:40 PM] •Please be advised that our provider has moved the emergency maintenance from October 16, 2022 (Sunday) to October 17, 2022 (Monday) 2:00 AM to 3:00 AM (PHT).

[10/17/2022 | 4:00 AM] • The emergency maintenance has been successfully completed on its scheduled time.

15th October 2022

Ticket#10175532 | October 15 and 16, 2022 | JMT and OSB | Access Point Firmware Upgrade, scheduled 2 years ago

[14/10/2022| 3:44 PM PHT] • Please be advised that we will be conducting a firmware upgrade on the wireless devices across the mentioned sites on October 15, 2022, and October 16, 2022, from 10:00 AM to 11:00 AM PHT. This upgrade is to resolve the current vulnerability on our access points.

[16/10/2022| 11:00 AM PHT] • The firmware upgrade has been successfully completed.

14th October 2022

No incidents reported

13th October 2022

No incidents reported

12th October 2022

Ticket#10175016 | October 12, 2022 | All Sites | Forticlient VPN Connectivity, scheduled 2 years ago

[12/10/2022 | 7:28 PM] • Please be advised that the emergency maintenance has been completed. We have checked the VPN connectivity and Forticlient connectivity should be working as usual.

[12/10/2022 | 6:53 PM] •Please be advised that we will be conducting an Emergency Fortigate VPN Upgrade from 7:00 PM – 7:30 PM (PHT) today, October 12, 2022. •The purpose of this maintenance is to remediate vulnerability and fortify the security of our network. •During the maintenance, you will be experiencing a 30-minute downtime on your VPN connectivity via Forticlient.

11th October 2022

No incidents reported

10th October 2022

No incidents reported