7th July 2023

Site Operational Status Ticket#10243578 | July 7, 2023 | GDB | Power Outage

• Event : Power Outage

• Schedule : June 7, 2023 (Friday) | 6:30 PM - On-going (PHT)

• Update: We have confirmed that power is back up at our GDB site.

• Status: Resolved

Power Ticket#xxxxx | July 7, 2023 | NTB | Power Interruption

• Event : Power Interruption

• Schedule : June 7, 2023 (Friday) | 8:45 AM - On-going (PHT)

• Update: We have received a notification from our Facilities Admin that our NTB office experienced a power outage on July 7, 2023, at approximately 8:45 AM. The power outage was caused by a disconnected fuse link, and it was determined that the transformers were damaged. BENECO is still working on replacing the transformer with the same specifications. Meanwhile, the building is powered by two backup generators. Since last Friday, our BA has been alternating between its two backup generators to prevent the genset from overheating.

Power fluctuations are to be expected at NTB site during switching of generator set.

The building's power source is currently powered by a generator, and the impact is expected to be minimal.

• Status: Ongoing