All systems are operational
Scheduled Maintenance
#SR-243247 | June 25, 2025 | IPLC Connectivity Maintenance

• Event: Relocation of Fiber Optical Cable

• Schedule: June 25, 2025 (Wednesday) | 05:00 AM – 12:00 PM (PHT)

• Activity Details:

Hi Team,

Please be informed that our service provider will be performing maintenance to relocate the fiber optical cable that hosts our circuit.

During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Latency Increase on IPLC VPC

#SR-243162 | June 28-29, 2025 | All Sites | Systems Engineering and Administration Maintenance

• Event: Windows Servers Patching Activity

• Schedule 1: June 28, 2025 (Saturday) | 09:30 AM – 02:30 PM (PHT)

• Schedule 2: June 29, 2025 (Sunday) | 09:30 AM – 04:30 PM (PHT)

• Activity Details:

Hi Team,

We wish to inform you about an upcoming maintenance activity scheduled for affected servers on June 28, 2025 to June 29, 2025. Our Systems and Administration Team will be conducting patching activities for our Windows Servers to ensure the security and stability of our systems.

Please be advised that the following services will encounter a total of 60 minutes interruption during the maintenance window per server:

Schedule 1: June 28, 2025 (Saturday) | 09:30 AM – 02:30 PM (PHT)

  • PRTG Network Monitor (Primary) – Internal
  • CCTV Server – Internal
  • PRTG Network Monitor (Secondary) – Internal -North Virginia DHCP Server
  • North Virginia AD Server

Schedule 2: June 29, 2025 (Sunday) | 09:30 AM – 04:30 PM (PHT)

  • Ubiquiti Wi-Fi Controller
  • Finance Remote Desktop Server
  • SG DHCP Server
  • Primary Domain Controller
  • Manila DHCP Server
  • Finance File Server
  • Manila AD Server

Note: No Impact is expected to our Client/End user operation.

We will work diligently to complete the necessary updates as quickly as possible and minimize any disruption. If you have any questions or concerns regarding this activity, please feel free to reach out to our support team at helpme@emapta.com.

• Service Impact: Windows Servers – All Sites

#SR-243252 | June 30, 2025 | IPLC Connectivity Maintenance

• Event: Optical Fiber Cable Replacement

• Schedule: June 30, 2025 (Monday) | 10:00 AM – 10:00 PM (PHT)

• Activity Details:

Please be informed that our service provider will be conducting a fiber optical cable replacement that hosts our circuit.

During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Latency Increase on IPLC VPC

#SR-243286 | July 06, 2025 | All PH Sites | Site to Datacenter Circuit Network Maintenance

• Event: Network Device Software Upgrade

• Schedule: July 06, 2025 (Sunday) | 01:00 AM – 06:00 AM (PHT)

• Activity Details:

Hi Team,

We would like to inform you that one of our service providers will be performing a service migration to a new platform, along with a software upgrade of their network devices. This initiative aims to enhance network security, improve performance, and ensure overall system reliability.

During the maintenance window, a maximum of two (2) hours of interruption is expected. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

  • Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype.
  • Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams.
  • Latency Issues – Delays in response times, particularly for real-time applications.
  • Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Internet and Network Connectivity Interruption

Past Incidents

26th April 2025

#SR-197219 | April 26, 2025| ASB & IBM Site | Service Provider Network Maintenance, scheduled 1 month ago

• Event: Network Device Software Upgrade

• Schedule: April 26, 2025 (Saturday) 1:00 AM to 6:00 AM (PHT) - Cancelled

• Activity Details: We would like to inform you that one of our service providers will be conducting a software upgrade of their network device to enhance network security, performance, and overall system functionality.

• Service Impact: Partial Internet Connectivity Interruption – ASB & IBM Site

19th April 2025

#SR-197068 |April 19, 2025| PNB | PNB Power Interruption, scheduled 2 months ago

• Event: Total Power Shutdown

• Schedule: April 19, 2025 (Saturday) | 9:00 AM – 4:30 PM (PHT)

• Activity Details:

Please be advised that a scheduled power interruption will take place on Saturday, April 19, 2025, to facilitate the retightening of panels in the AHU Room, from the Penthouse down to the Basement Floor. This activity is part of the ongoing maintenance work being conducted by the PNB Property Management Office.

Schedule:

• 11th and 10th Floor | 9:00 AM - 9:30 AM
• 6th and 5th Floor | 10:00 AM - 10:30 AM
• 4th Floor | 11:00 AM - 11:30 AM
• Basement | 4:00 PM - 4:30 PM

Additional information:

• Time Schedule may change depending on the number of panels inside AHU room and approximately 30 minutes per AHU
• Power interruption per floor is approximately 30 minutes per floor.

For any concerns or assistance, please reach out to:

📌 Facilities and Admin – Available onsite at the 5th-floor lobby for in-person assistance.

📌 IT Support – Reach out via email at helpme@emapta.com for technical concerns.

• Service Impact :

• Power: No power supply in the affected areas for the entire duration.
• Network: Minimal to no impact is expected on our network devices as all floors are equipped with Uninterruptible Power Supply (UPS), which will sustain power throughout the 
  maintenance period.
#SR-196832 | April 19-20, 2025| Orient Square Building (OSB) | Annual Preventive Maintenance, scheduled 2 months ago

• Event: Total Power Shutdown

• Schedule: April 19, 2025 (7:00 AM) to April 20, 2025 (7:00 AM)

• Activity Details:

The OSB building administration will conduct its annual preventive maintenance to inspect electrical accessories and perform recalibration. This will involve a total electrical shutdown, and generators will NOT be available during the maintenance period.

For any concerns or assistance, please reach out to:

📌 Facilities and Admin – Available onsite at the 2nd floor lobby for in-person assistance.

📌 IT Support – Reach out via email at helpme@emapta.com for technical concerns.

We appreciate your patience and cooperation. Please plan accordingly and let us know if you need further assistance.

• Service Impact: Building Power Supply – Orient Square Building (OSB)

14th April 2025

#INC-198212 | April 13, 2025| BET, NTB & PNB Sites | Service Provider Network Maintenance, scheduled 2 months ago

• Event: Network Device Software Upgrade

• Schedule: April 13, 2025 (Sunday) 1:00 AM to 6:00 AM (PHT)

• Activity Details: We would like to inform you that one of our service providers will be conducting a software upgrade of their network device to the latest version to enhance network security, performance, and overall system functionality. During the maintenance window, a maximum of two (2) hours of interruption is expected. However, due to our network's configuration, which includes backup circuits, we expect only a partial impact on the internet and network connectivity, as we have automatic failovers in place.

• Service Impact: Partial Internet Connectivity Interruption – BET, NTB & PNB Sites

12th April 2025

No incidents reported

11th April 2025

Site Operational Status Ticket#INC-197574 | April 11, 2025| TIP | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: April 11, 2025 (Friday) | 3:53 AM – 5:19 AM (PHT)

• Activity Details: Dear Team,

Please be informed that one of our Site to Datacenters Circuit is currently experiencing a service disruption. We are actively coordinating with our circuit provider to gather more details on the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4-5 minute timeframe while automatic failovers/failback activate.

We will provide further updates as soon as we receive more information. Thank you for your patience and understanding.

• Service Impact: Partial impact on network and internet connectivity - TIP

• Status: Restored

10th April 2025

Network and Internet Ticket#INC-196637 | Aptil 10, 2025| JMT | Unplanned | Site to Datacenter Circuit Network Interruption

• Event: Partial Outage on Network and Internet Connectivity

• Schedule: April 10, 2025 (Thursday) | 2:29 AM - 3:00 AM - Restored • Activity Details: Hi Team,

Please be informed that one of our Site to Datacenter Circuit is currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – JMT Site

• Status: Restored

9th April 2025

No incidents reported

8th April 2025

Site Operational Status #INC-195523 |April 8, 2025|NTB| Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: April 8, 2025 (Tuesday) 4:24 PM (PHT) - 5:08 PM - Restored

• Activity Details :

We would like to inform you that one of our site-to-datacenter circuit in NTB site has experienced interruption around 4:24 PM (PHT). This has been reported to our provider for further investigation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. During the failover process, you may experience brief disruptions on any of the following below: Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. Latency Issues – Delays in response times, particularly for real-time applications. Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity – NTB Site

• Status: Restored

7th April 2025

No incidents reported

6th April 2025

No incidents reported

5th April 2025

No incidents reported

4th April 2025

No incidents reported

3rd April 2025

No incidents reported