#SR-263497 | July 26, 2025 | All PH Sites | Site to Datacenter Circuit Network Maintenance

• Event: Service Provider New Firewall Migration

• Schedule: July 26, 2025 (Saturday) | 12:00 AM – 06:00 AM (PHT)

• Activity Details:

Hi Team,

As part of the ongoing efforts to provide an enhanced security and protection to our network, one of our service providers will conduct a Next Generation Firewall Upgrade on July 26, 2025, from 12:00 AM – 06:00 AM (PHT).

During the maintenance window, we expect a minimal to no impact on internet and network connectivity as automatic failover mechanisms are in place to ensure service continuity.

Further updates shall be provided as soon as they are available.

• Service Impact: Minimal to No Impact on Internet and Network Connectivity - All PH Sites

#SR-262892 | July 26, 2025 | 6F PNB Building, Makati | Uninterruptible Power Supply Replacement

• Event: New Uninterruptible Power Supply (UPS) Installation

• Schedule: July 26, 2025 (Saturday) | 08:00 AM – 12:00 PM (PHT)

• Activity Details:

Hi Team,

Our systems engineering and administration team will be installing a New Uninterruptible Power Supply (UPS) to replace the old UPS to avoid and mitigate the risk of power issues on our networking devices.

During the maintenance window, brief interruptions may occur as we replace the UPS units one at a time to minimize interruption and to ensure network and internet availability. Please note that users connected via Wired/LAN may experience temporary disruptions.

As a temporary alternative, we recommend connecting to #EmaptaExperience Wireless SSID to maintain internet access during the said activity.

For any additional support, please reach out to our Onsite Service Desk.

• Service Impact: July 26, 2025 (Saturday) | 08:00 AM – 12:00 PM (PHT)

Past Incidents

16th July 2023

Ticket#10243307 | July 16, 2023 and July 23, 2023| Direct Internet Access | Planned Internet Service Provider Network Maintenance, scheduled 2 years ago

• Event : Network Device Software Upgrade

• Schedule :

Phase 1: July 16, 2023 (Sunday) | 9:00 AM to 5:00 PM (PHT) Phase 2: July 23, 2023 (Sunday) | 9:00 AM to 5:00 PM (PHT)

• Activity Details :

One of our service providers will be upgrading the software on one of their core routers to its latest version to increase service availability and internet quality.

• Service Impact : Direct Internet Access latency increase

• Status: Phase 1 completed Phase 2 completed

Ticket#10243308 | July 16, 2023 and July 23, 2023| All Sites | Planned Internet Service Provider Network Maintenance, scheduled 2 years ago

• Event : Network Device Software Upgrade

• Schedule :

Phase 1: July 16, 2023 (Sunday) | 9:00 AM to 5:00 PM (PHT) Phase 2: July 23, 2023 (Sunday) | 9:00 AM to 5:00 PM (PHT)

• Activity Details :

One of our service providers will be upgrading the software on one of their core routers to its latest version to increase service availability and internet quality.

• Service Impact : Internet Access latency increase – All Sites

• Status: Phase 1 completed Phase 2 completed

14th July 2023

No incidents reported

13th July 2023

Ticket#10242412 | July 13, 2023| IPLC | Planned | Third-party Service provider Maintenance, scheduled 2 years ago

• Event : Omantel Essential Maintenance

• Schedule : July 13, 2023 (Thursday) | 5:00 PM – 11:00 PM (PHT)

• Activity Details : The third-party provider from our internet service provider will be performing essential maintenance to troubleshoot "Input Signal Power Low" alarm in Fiber pair F2F and F5F at Marseille-2.

• Service Impact : Latency increase in IPLC Connectivity

• Status: Completed

12th July 2023

No incidents reported

11th July 2023

No incidents reported

10th July 2023

No incidents reported

9th July 2023

No incidents reported

8th July 2023

No incidents reported

7th July 2023

Site Operational Status Ticket#10243578 | July 7, 2023 | GDB | Power Outage

• Event : Power Outage

• Schedule : June 7, 2023 (Friday) | 6:30 PM - On-going (PHT)

• Update: We have confirmed that power is back up at our GDB site.

• Status: Resolved

Power Ticket#xxxxx | July 7, 2023 | NTB | Power Interruption

• Event : Power Interruption

• Schedule : June 7, 2023 (Friday) | 8:45 AM - On-going (PHT)

• Update: We have received a notification from our Facilities Admin that our NTB office experienced a power outage on July 7, 2023, at approximately 8:45 AM. The power outage was caused by a disconnected fuse link, and it was determined that the transformers were damaged. BENECO is still working on replacing the transformer with the same specifications. Meanwhile, the building is powered by two backup generators. Since last Friday, our BA has been alternating between its two backup generators to prevent the genset from overheating.

Power fluctuations are to be expected at NTB site during switching of generator set.

The building's power source is currently powered by a generator, and the impact is expected to be minimal.

• Status: Ongoing

6th July 2023

No incidents reported

5th July 2023

No incidents reported