Some systems are experiencing issues
Scheduled Maintenance
#SR-246827 | June 28, 2025 | SM MegaTower, Ortigas| Site to Datacenter Circuit Network Maintenance

• Event: Data Link Layer Testing

• Schedule: June 28, 2025 (Saturday) | 08:00 AM – 08:00 PM (PHT)

• Activity Details:

Hi Team,

Please be informed that one of our third-party providers will conduct a network maintenance and testing on June 28, 2025, from 08:00 AM – 08:00 PM (PHT) due to a recent incident that requires immediate action.

Please be advised that during the maintenance window, a 10-hour testing period will take place, which will result in a total downtime on one of our SMT Site to Datacenter circuits. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

  • Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype.
  • Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams.
  • Latency Issues – Delays in response times, particularly for real-time applications.
  • Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity

#SR-243162 | June 28-29, 2025 | All Sites | Systems Engineering and Administration Maintenance

• Event: Windows Servers Patching Activity

• Schedule 1: June 28, 2025 (Saturday) | 09:30 AM – 02:30 PM (PHT)

• Schedule 2: June 29, 2025 (Sunday) | 09:30 AM – 04:30 PM (PHT)

• Activity Details:

Hi Team,

We wish to inform you about an upcoming maintenance activity scheduled for affected servers on June 28, 2025 to June 29, 2025. Our Systems and Administration Team will be conducting patching activities for our Windows Servers to ensure the security and stability of our systems.

Please be advised that the following services will encounter a total of 60 minutes interruption during the maintenance window per server:

Schedule 1: June 28, 2025 (Saturday) | 09:30 AM – 02:30 PM (PHT)

  • PRTG Network Monitor (Primary) – Internal
  • CCTV Server – Internal
  • PRTG Network Monitor (Secondary) – Internal -North Virginia DHCP Server
  • North Virginia AD Server

Schedule 2: June 29, 2025 (Sunday) | 09:30 AM – 04:30 PM (PHT)

  • Ubiquiti Wi-Fi Controller
  • Finance Remote Desktop Server
  • SG DHCP Server
  • Primary Domain Controller
  • Manila DHCP Server
  • Finance File Server
  • Manila AD Server

Note: No Impact is expected to our Client/End user operation.

We will work diligently to complete the necessary updates as quickly as possible and minimize any disruption. If you have any questions or concerns regarding this activity, please feel free to reach out to our support team at helpme@emapta.com.

• Service Impact: Windows Servers – All Sites

#SR-244268 | June 28, 2025 (Saturday) | SM City Clark, Pampanga | Internal Network Maintenance

• Event: Additional High Availability Deployment

• Schedule: June 28, 2025 (Saturday) | 04:00 PM – 05:00 PM (PHT)

• Activity Details:

Hi Team,

As part of our ongoing efforts to enhance network redundancy and improve overall system reliability, our team will be implementing an additional high availability deployment to minimize the risk of service interruptions

During the maintenance window, we anticipate minimal to no impact on internet and network connectivity.

Automatic failover mechanisms are in place to maintain uninterrupted service and ensure business continuity.

We will continue to monitor the network closely throughout the process and will provide updates if any unexpected issues arise.

• Service Impact: Minimal to no impact on Internet and Network Connectivity

#SR-243252 | June 30, 2025 | IPLC Connectivity Maintenance

• Event: Optical Fiber Cable Replacement

• Schedule: June 30, 2025 (Monday) | 10:00 AM – 10:00 PM (PHT)

• Activity Details:

Please be informed that our service provider will be conducting a fiber optical cable replacement that hosts our circuit.

During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Latency Increase on IPLC VPC

#SR-243286 | July 06, 2025 | All PH Sites | Site to Datacenter Circuit Network Maintenance

• Event: Network Device Software Upgrade

• Schedule: July 06, 2025 (Sunday) | 01:00 AM – 06:00 AM (PHT)

• Activity Details:

Hi Team,

We would like to inform you that one of our service providers will be performing a service migration to a new platform, along with a software upgrade of their network devices. This initiative aims to enhance network security, improve performance, and ensure overall system reliability.

During the maintenance window, a maximum of two (2) hours of interruption is expected. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

  • Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype.
  • Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams.
  • Latency Issues – Delays in response times, particularly for real-time applications.
  • Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Internet and Network Connectivity Interruption

Past Incidents

23rd November 2024

Ticket#117288 | November 23, 2024| All Sites | Software/Operating System Upgrade, scheduled 7 months ago

• Event : Planned - Site to Datacenter Network Maintenance at All Sites

• Schedule : November 23, 2024 (Saturday) | 1:00 AM to 5:00 AM (PHT)

• Activity Details : One of our service providers will be conducting a software / operating system upgrade on one of their network monitoring systems to ensure updates in the system is being check and logs accurately.

This is a non-service impacting maintenance activity.

• Service Impact : Non-service impacting – All Sites

Ticket#117240 | November 23, 2024| SCT (Pampanga) and JEG (Cebu)| Link Migration, scheduled 7 months ago

• Event : Planned - Site to Datacenter Network Maintenance at SCT (Pampanga) and JEG (Cebu

• Schedule : November 23, 2024 (Saturday) | 1:00 AM to 5:00 AM (PHT)

• Activity Details : As part of the continued efforts to increase service availability and internet quality, one of our service providers will be conducting a link migration on one of the backhaul links in manila to another switch.

This is a non-service impacting activity maintenance but possible changes in latency may observed as traffic is switchover through alternative links.

• Service Impact : Non-service impacting – SCT and JEG Site

19th November 2024

No incidents reported

18th November 2024

No incidents reported

17th November 2024

Ticket#INC-118104 |November 17, 2024 | All Sites | Planned | Data Center Network Maintenance, scheduled 7 months ago

• Event : Core Router Maintenance Activity

• Schedule : November 17, 2024 | 03:00 AM to 06:00 AM PHT

• Activity Details : Hi Team,

As part of our efforts to enhance service availability and reliability, our team will be performing network maintenance on one of our data centers.

During the maintenance window, we expect a brief service interruption of approximately 5 minutes across all sites.

• Service Impact : 5 minutes service interruption – All sites

• Status: Completed

16th November 2024

No incidents reported

15th November 2024

INFINIVAN Ticket#INC-118705| November 15, 2024 | All Sites| Unplanned | Datacenter Internet Uplink Network Interruption

• Event : Partial Outage on Network and Internet Connectivity

• Incident Date/Time : 1st Instance: November 15, 2024 (Friday) | 10:32 PM – 10:33 PM (PH-Time) 2nd Instance: November 15, 2024 (Friday) | 11:28 PM – 11:29 PM (PH-Time) 3rd Instance: November 15, 2024 (Friday) | 11:58 PM – 11:59 PM (PH-Time

• Activity Details : Hi Team,

Please be informed that we experienced 3 brief service interruptions on one of our data center internet uplinks started at 10:32 PM and has been restored at 11:59 PM. We are closely monitoring the situation.

We are currently coordinating with our circuit provider to gather more details about the issue encountered.

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites

14th November 2024

No incidents reported

13th November 2024

No incidents reported

12th November 2024

No incidents reported

11th November 2024

No incidents reported

10th November 2024

Ticket#INC-115115 | November 10, 2024 | BET, IBM, NTB, ASB, SCT, JMT, and PNB | Multiple Sites Network and Internet Connectivity Interruptions - Recovered

• Event : Unplanned | Multiple Site to Datacenter Connectivity Interruptions - November 10, 2024

• Incident : November 10, 2024 (Sunday) | 6:42 PM to 6:53 PM (PHT) – First Instance November 10, 2024 (Sunday) | 8:04 PM to 8:26 PM (PHT) – Second Instance, Ongoing Restoration

• Activity Details : Please be advised that the affected circuits have been recovered. According to our service provider, backhaul links have been repaired. The impacted circuits in our infrastructures have been recovered and monitored stable for 5 hours

All circuits are now fully operational with redundancy.

• Service Impact : Recovered


• Event : Unplanned | Multiple Site to Datacenter Connectivity Interruptions - November 10, 2024

• Incident : November 10, 2024 (Sunday) | 6:42 PM to 6:53 PM (PHT) – First Instance November 10, 2024 (Sunday) | 8:04 PM to 8:26 PM (PHT) – Second Instance, Ongoing Restoration

• Activity Details : We have observed second instance of interruption at around 8:04 PM and as per our service provider this is due to multiple backhaul links are down, and their restoration team is currently en route to the fault location to conduct necessary checks. No ETR yet provided to us but will do necessary follow ups.

During the interruptions, only partial impact on network and internet connectivity is expected as we have another site to datacenter connectivity available for connection redundancy

We do apologize for any inconvenience it has caused.

• Service Impact : Partial Network and Internet Connectivity Interruptions on both wired and wireless connection – BET, IBM, NTB, ASB, SCT, JMT, and PNB