26th December 2024

Ticket#133356 | December 26 and 27, 2024| Philippine National Bank (PNB-Makati)|Circuit / Load Verification of Electrical System, scheduled 5 months ago

• Event : Planned Power Service Maintenance at Philippine National Bank (PNB-Makati)

• Schedule : December 26, 2024 (Thursday) | 5:00 PM to 5:30 PM (PHT) and December 27, 2024 (Friday) | 5:00 PM to 5:30 PM (PHT)

• Activity Details : Our facilities and building administration team will be conducting a circuit / load verification of our electrical system for our LVSG. This is inclined with the verification of As-built plan of the contractor.

During the maintenance activity, an approximate of 15 – 30 minutes of power interruption is expected as they will switch the main feeder circuit breaker to on and off (vice versa).

In line with this, our FA/BA advised that all UPS and Emergency lights are working and operational.

If you have questions or clarification , please feel free to reach out to our @SD Facilities and Admin.

• Service Impact : 15 – 30 minutes of Power Interruptions per floor – PNB Site

20th December 2024

Network and Internet Ticket#INC-135546 | December 20, 2024 | EPC COL | Unplanned | Internet Service Provider Network Interruption - RESTORED

• Event : Partial Interruption on Network and Internet Connectivity

• Schedule : December 20, 2024 (Friday) | 1:35 AM – 4:25 AM (PH-Time) - RESTORED

• Activity Details : Hi Team,

Please be informed that the affected circuit was recovered around 4:25 AM (PH time). We are closely monitoring its performance to ensure continued stability.

Additional information and a Root Cause Analysis (RCA) of the incident will be shared as soon as it becomes available.

All circuits are currently fully operational with redundancy in place. We will continue to monitor the situation to maintain stability.

• Service Impact : Partial Impact on Internet and Network Connectivity – EPC COL


• Event : Partial Interruption on Network and Internet Connectivity

• Schedule : December 20, 2024 (Friday) | 1:35 AM – Ongoing AM (PH-Time)

• Activity Details : Hi Team,

Please be informed that one of our Internet Uplink circuit is currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4-5 minute timeframe while automatic failovers/failback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – EPC COL

19th December 2024

No incidents reported

18th December 2024

No incidents reported

17th December 2024

No incidents reported

16th December 2024

No incidents reported

15th December 2024

Ticket#131417 | December 15, 2024| Asian Star Building (ASB-Alabang)| New Uninterruptible Power Supply (UPS) Installation, scheduled 6 months ago

• Event : Planned Uninterruptible Power Supply Replacement at Asian Star Building (ASB-Alabang)

• Schedule : December 15, 2024 (Sunday) | 10:00 AM to 12:00 NN (PHT)

• Activity Details : Our systems engineering and administration team will be installing a new Uninterruptible Power Supply (UPS) to replace the old UPS to avoid and mitigate the risk of power issues on our networking devices.

During the activity, a partial impact on network and internet connectivity on both wired and wireless connection is expected, but we have another site to data center circuit available for connection redundancy while we transfer our other networking devices from old to new Uninterruptible Power Supply (UPS).

Apologies for any inconvenience this might cause.

Please feel free to reach to us if you have questions or clarifications.

• Service Impact : Partial impact on network and internet connectivity on both wired and wireless connection – ASB Site

• Status: Completed

Ticket#131433 | December 15, 2024|Asian Star Building (ASB-Alabang) |Site-to-Datacenter Network Circuit Testing, scheduled 6 months ago

• Event : Planned | Site to Datacenter Network Maintenance at Asian Star Building (ASB-Alabang)

• Schedule : December 15, 2024 (Sunday) | 8:00 AM to 10:00 AM (PHT)

• Activity Details : One of our service providers will be conducting a network circuit testing to rectify and check the high latency found on our site-to-datacenter circuit.

During the testing activity, user’s onsite may experience an intermittency on network and internet connectivity for both wired and wireless connection.

Apologies for any inconvenience this might cause.

• Service Impact : Network and Internet Intermittency on both wired and wireless connection – ASB Site

• Status: Completed