All systems are operational
Scheduled Maintenance
#SR-262892 | July 26, 2025 | 6F PNB Building, Makati | Uninterruptible Power Supply Replacement

• Event: New Uninterruptible Power Supply (UPS) Installation

• Schedule: July 26, 2025 (Saturday) | 08:00 AM – 12:00 PM (PHT)

• Activity Details:

Hi Team,

Our systems engineering and administration team will be installing a New Uninterruptible Power Supply (UPS) to replace the old UPS to avoid and mitigate the risk of power issues on our networking devices.

During the maintenance window, brief interruptions may occur as we replace the UPS units one at a time to minimize interruption and to ensure network and internet availability. Please note that users connected via Wired/LAN may experience temporary disruptions.

As a temporary alternative, we recommend connecting to #EmaptaExperience Wireless SSID to maintain internet access during the said activity.

For any additional support, please reach out to our Onsite Service Desk.

• Service Impact: July 26, 2025 (Saturday) | 08:00 AM – 12:00 PM (PHT)

Past Incidents

6th April 2023

Ticket#10209873 | April 06, 2023 | PNB | Electrical System Preventive Maintenance, scheduled 2 years ago

• Event : Planned Power Service Maintenance

• Schedule : April 06, 2023 (Thursday) | From 8:00 am onwards

• Activity Details :Our facilities and admin building will be conducting an electrical system preventive maintenance as part of their annual preventive maintenance activity to ensure that the building electrical systems is in its perfect condition. During the window time, there will be an estimated time of 1 hour preventive maintenance activity per floor and they will prioritize power interruptions per floors where tenants have their respective data center/server room.

• Service Impact : Power Supply Building

• Status: Completed

19th March 2023

No incidents reported

18th March 2023

Ticket#10209897 | March 18, 2023 | PNB | EMAPTA Network Activity Maintenance, scheduled 2 years ago

• Event : EMAPTA Internal Network Maintenance

• Schedule : March 18, 2023 (Saturday) | 9:30 PM to 11:30 PM (PHT)

• Activity Details : We will be conducting a network activity maintenance to mitigate the network issues at PNB. During the window time, an intermittent on internet and network connectivity is expected.

• Service Impact :Intermittent network and internet connectivity

• Status: Completed

17th March 2023

No incidents reported

16th March 2023

No incidents reported

15th March 2023

Ticket#10209309 | March 15, 2023 | VPC Latency | Unplanned ISP Backhaul Failure

• Event : ISP Backhaul Failure

• Schedule : March 15, 2023 (Wednesday) | 6:00 PM (PHT) – March 16, 2023 (Thursday) 2:56 PM (PHT) - Restored

• Activity Details : Our ISP has been successfully restored the IPLC outage yesterday at exactly 11:30 AM (PHT) as well as the backhaul at exactly 2:56 PM (PHT). As per monitoring and observation, IPLC has been up and stable and the NCP VPC’s are now at a normal latency range.

As per our ISP they will provide the official RFO by 03/21/2023 and will provide upon your request.

• Service Impact : +50ms latency on NCP VPC and IPLC Outage

• Status: Restored


• Event : ISP Backhaul Failure

• Schedule : March 15, 2023 (Wednesday) | 6:00 PM (PHT) - Ongoing

• Activity Details : We have monitored that our IPLC is currently monitored down, and we are already doing a necessary follow up to our ISP and waiting for their response for a ETR. During this incident time, the traffic will be automatically failover to the VPN connection resulting in increase of latency with the NCP VPCs.

• Service Impact : +50ms latency on NCP VPC and IPLC Outage

• Status: Ongoing restoration


• Event : ISP Backhaul Failure

• Schedule : March 15, 2023 (Wednesday) | 6:00 PM (PHT) - Ongoing

• Activity Details : Our ISP informed us that they discovered a backhaul failure between Makati and Pasig (Philippines). The protected circuit remains operational, but the longer path will result in a +50 ms latency

• Service Impact : +50ms latency on VPC

• Status: Ongoing restoration

14th March 2023

No incidents reported

13th March 2023

No incidents reported

12th March 2023

No incidents reported

11th March 2023

Ticket#10208143 | March 11, 2023 | All Users | Authentication Issues with Active Directory - Empower, EMAPTA VPN

• Event : Authentication Issues

• Schedule : March 11, 2023 (Saturday) | 10:00 AM (PHT) - On-going

• Incident Details : We are currently investigating an issue relating to authentication on our systems. This is affecting EMPOWER logins, EMAPTA VPN, book.emapta.com, etc. and may affect users connecting to wireless network in our sites. We have determined the root cause for this and we are working to resolve this.

• Service Impact : Unable to login using Empowerteams, book.emapta.com, and VPN credentials

• Status: Root cause determined, resolving.

10th March 2023

No incidents reported