13th June 2022

Ticket#10144972 | IPLC | IPLC Connectivity Maintenance, scheduled 3 years ago

[06/14/2022 | 4:38 AM (PHT)] • Please be advised that the maintenance has been completed successfully. All affected circuits have been proven operational. IPLC and VPC latency are within the normal range.

[05/27/2022 | 2:55 PM (PHT)] • Our service provider will perform firmware upgrades to improve network resiliency and stability. Please expect a maximum of 4 x 60 minutes outage on June 13, 2022 6:00 PM to 2:00 AM (PHT).

10th June 2022

Ticket#10146001 | IPLC | IPLC Connectivity Maintenance, scheduled 3 years ago

[06/11/2022 | 3:35 AM PHT] • Please be advised that the maintenance has been completed successfully, we have checked the affected circuit, and has been proven operational. IPLC and VPC latency are within the normal range. [06/02/2022 | 8:00 AM PHT] • EuNetworks will be performing standard splice works. The maintenance window is scheduled for June 10, 2022, Friday from 4:00 AM (PHT) to June 11, 2022, Saturday at 12:00 AM (PHT). The expected impact is possible flaps during the maintenance window.

9th June 2022

Ticket#10146365 | IPLC | IPLC Connectivity Maintenance, scheduled 3 years ago

[0n6/10/2022 | 4:31 AM] • Please be advised that the maintenance has been completed successfully, we have checked the affected circuit, and has been proven operational. IPLC and VPC latency are within the normal range.

[03/06/2022 | 1:53 PM] •Our service provider will perform the activities and some channels will be reconfigured. •During the maintenance window, our service provider has advised us of an expected impact of 50ms switch hits within the change window.

7th June 2022

Ticket#10146055 | IPLC | IPLC Connectivity Maintenance, scheduled 3 years ago

[08/06/2022 | 06:19 PM] • Please be advised that the maintenance has been completed successfully, we have checked the affected circuit and has been proven operational. IPLC and VPC latency are within the normal range.

[02/06/2022 | 11:07 AM] • Our service provider will perform preventive maintenance on its network to divert cables due to civil works. During the maintenance window on June 07, 2022 (Tuesday) at 4:00 AM to 12:00 PM, please expect impact of increased latency on the IPLC.

5th June 2022

Ticket#10145107 | IPLC | Planned Network Connectivity Maintenance, scheduled 3 years ago

[June 6, 2022, | 2:35 PM] • Please be advised that the maintenance has been completed successfully, we have checked the affected circuit, and has been proven operational. IPLC and VPC latency are within the normal range.

[May 28, 2022 | 4:08PM] • Our service provider will be performing cable relocation due to road works. The expected impact will be an increase in latency and loss of protection during the maintenance period.

4th June 2022

No incidents reported

3rd June 2022

Ticket#10146248 | Remote Users | Unplanned Forticlient Outage

[6/3/2022 | 10:18 AM] • Please advise that the Forticlient is now up approximately 3 hours. The team validated the initial root cause (Issue between Network and ESXi Cluster) and will provide further findings in the next updates.

[6/3/2022 | 8:55 AM] • Please advise that the Forticlient is now up for about 2 hours. The team continues to monitor and investigate the possible root cause of the issue.

[6/3/2022 | 7:27 AM] • Please advise that the Forticlient is now up around 6:49 AM PHT, we are still currently doing a further investigation until we find the root cause of the issue.

[6/3/2022 | 4:32 AM] • Please be advised that there was an ongoing outage with Forticlient which started at 4:32 AM today, WFH users are currently unable to connect on the VPN. were still further investigating the issue. Will keep you posted on any latest updates.

Ticket#10144971 | IPLC | IPLC Connectivity Maintenance, scheduled 3 years ago

[6/5/2022 | 9:50 AM] • Please be advised that the maintenance has been completed successfully. No outstanding alerts has been observed related on this maintenance.

[5/27/2022 | 2:49PM (PHT)] • Our service provider will perform troubleshooting and rectification of high span loss. During the maintenance window of June 3, 2022, 5:00PM - 9:00PM (PHT), please expect impact of increased latency on the IPLC.

2nd June 2022

Ticket#10142928 | TIM Carmona | Planned Data Center Rack and Equipment Cleaning, scheduled 3 years ago

[5/17/2022| 3:42 PM] • One of our Data Centers will conduct Rack and Equipment Cleaning on June 2, 2022 5 PM onwards. During the maintenance period no services will be affected.

[6/02/2022| 7:24 PM] Please be advised that the maintenance has been completed successfully. As expected, no monitored impact on our equipment and services.

1st June 2022

Power Ticket#10145863 | Neutrinus Building, Baguio| Unplanned Power Outage

[01/06/2022| 10:00 AM] • Power outage currently experienced on site, building is currently running through a power generator. BENECO has an ongoing repair of their transformer that affects the electricity at Emapta Pilando Center Building.

[01/06/2022| 4:10 PM] Please be advised that the main power has been restored at Emapta Pilando Center Baguio around 4:10 PM today, Wednesday, June 1, 2022. All network devices are currently operational. No alerts relating to the power outage have been observed. The power supply for the building has been stable since it was restored.

31st May 2022

Network and Internet Ticket#10145519 | Jaka Building, Makati | Unplanned - One of Data Center Uplink going to JKB Building is down

[05/31/2022 | 3:53 PM PHT] • Please be advised that our uplink going to one of our Data Centers was monitored up around 1:25 PM and has been stable for an hour. The affected uplink has been tested and proven operational. Will continue to monitor for the whole day to ensure stability. The root cause is still under investigation.

[05/31/2022 | 9:53 AM PHT] • Please be advised that one of our Data Center Uplinks going to the Jaka Building is currently monitored down. One of our Data Center uplinks is still active and the impact onsite should be minimal to no impact. We already raised the issue to our Internet Service Provider for their investigation and resolution.

30th May 2022

Ticket#10145311 | GELDC Pampanga | Unplanned Power Interruption

[5/30/2022 | 2:58 PM] Please advised that Global Eco Link Development Corporation Building power supply is now running to its main power line as of 2:35 PM. There is no scheduled or planned power interruption for today per asking the admin in GELDC.

[5/30/2022 | 2:25 PM] • Please be advised that there is an ongoing power outage on Global Eco Link Development Corporation at 2:09 PM today. The Building power supply is currently running through a power generator.

29th May 2022

Ticket#10144750 | PNB Building and The Ignacia Place Building | Planned IT Infrastructure Maintenance, scheduled 3 years ago

[5/29/2022 | 10:56 PM] Please be advised that the scheduled maintenance at The Ignacia Place Building (Quezon City) has been completed successfully. The scheduled maintenance for May 29, 2022 8:00PM at PNB Building (Makati) will be rescheduled to a later date. When a new date for the PNB Building (Makati) maintenance has been identified, a notification advisory will be sent.

[5/26/2022 | 12:39 AM] • Please be advised that we will be conducting preventive maintenance at The Ignacia Place Building (Q.C) on May 29, 2022, at 8:00 AM, and PNB Building (Makati) on May 29, 2022 (Sunday) at 8:00 PM. During the maintenance, a maximum of 30 mins. downtime will experience during the maintenance window.

[5/26/92022 | 10:53 PM] Please be advised that the scheduled maintenance at The Ignacia Place Building (Quezon City) has been completed successfully. The scheduled maintenance for May 29, 2022, at 8 PM at PNB Building (Makati) will be rescheduled to a later date. When a new date for the PNB Building (Makati) maintenance has been identified, a notification advisory will be sent.