Some systems are experiencing issues
Scheduled Maintenance
#SR-231583 | June 10, 2025 | Neutrinus Building, Baguio | Power Interruption

• Event: BENECO Scheduled Power Interruption

• Schedule: June 10, 2025 (Tuesday) | 06:00 AM – 10:00 AM (PHT)

• Activity Details:

Hi Team,

This is to inform you that there will be a scheduled power interruption on Tuesday, June 10, 2025, from 06:00 AM – 10:00 AM (PHT) at our NTB Site.

During the schedule interruption of the commercial power, a generator set will run to support the site’s operation.

• Service Impact: Building Power Supply – NTB Site (All Floors)

#SR-231466| June 12, 2025 | IPLC Connectivity Maintenance

• Event: Subsea Fiber Cable Maintenance

• Schedule: June 12, 2025 (Thursday) | 02:00 AM – 03:00 AM (PHT)

• Activity Details:

Please be advised that our service provider will perform fiber span loss rectification maintenance on Thursday, June 12, 2025, from 2:00 AM to 3:00 AM (PHT).

During the maintenance window, a 15-minute service interruption on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Service interruption in IPLC Connectivity

#SR-231564 | June 16, 2025 | TIP, ASB | Site to Datacenter Circuit Network Maintenance

• Event: Network Device Software Upgrade

• Schedule: June 16, 2025 (Monday) | 12:00 AM – 06:00 AM (PHT)

• Activity Details:

Hi Team,

We would like to inform you that one of our service providers will be performing a software upgrade of their network device to the latest version to enhance network security, performance, and overall system functionality.

During the maintenance window, a maximum of a 2-hour interruption on one of our sites to datacenter circuit is expected. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. Latency Issues – Delays in response times, particularly for real-time applications. Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity

Past Incidents

26th April 2025

#SR-202493 |April 26 - 27, 2025|All Sites| Systems Engineering and Administration Maintenance, scheduled 1 month ago

• Event: Windows Servers Patching Activity

• Scheduled 1: April 26, 2025 (Saturday) | 9:30 AM – 02:30 PM (PHT) • Scheduled 2: April 27, 2025 (Sunday) | 9:30 AM – 04:30 PM (PHT)

• Activity Details: We wish to inform you about an upcoming maintenance activity scheduled for affected servers on April 26 - 27 2025. Our System and Administration Team will be conducting patching activities for our Windows Servers to ensure the security and stability of our systems.

Please be advised that the following services will encounter interruption a total of 60 minutes during the maintenance window per server:

Schedule 1: April 26, 2025 (Saturday) | 09:00 AM – 02:30 PM (PHT)

• PRTG Network Monitor (Primary) – Internal

• CCTV Server – Internal

• PRTG Network Monitor (Secondary) – Internal

• North Virginia DHCP Server

• North Virginia AD Server

Schedule 2: April 27, 2025 (Sunday) | 09:00 AM – 4:30 PM (PHT)

• Ubiquiti Wi-Fi Controller

• Finance Remote Desktop Server

• SG DHCP Server

• Primary Domain Controller

• Manila DHCP Server

• Finance File Server

• Manila AD Server

We will work diligently to complete the necessary updates as quickly as possible and minimize any disruption. If you have any questions or concerns regarding this maintenance activity, please feel free to reach out to our support team at helpme@emapta.com.

• Service Impact: No impact is expected on our Client/End user operation.

SR-202507 | April 26, 2025| SCT, JEG & SMT Sites| Planned | Service Provider Network Maintenance, scheduled 1 month ago

• Event: Network Device Software Upgrade

• Schedule: April 26, 2025 (Saturday) 1:00 AM to 6:00 AM (PHT) - Cancelled

• Activity Details: We would like to inform you that one of our service providers will be conducting a software upgrade of their network device to the latest version to enhance network security, performance, and overall system functionality.

There will be no disruption on our circuits; however, a minor increase in latency may be observed as traffic will be temporarily rerouted during the maintenance.

• Service Impact: Minimal to no Impact on Network and Internet Connectivity– SCT, JEG & SMT Sites

24th April 2025

#SR-205232| April 24, 2025 | EPC / Colombia | Network Interruption

• Event: Difficulties in Connecting to the Internet

• Schedule: April 24, 2025 (Thursday) | 03:54 PM (PHT) – 8:49 PM (PHT) - Restored

• Activity Details:

We are aware of the connectivity issues connecting to #EmaptaExperience affecting EPC Colombia. Our team is actively investigating the incident and has already escalated it to the service provider for further checking and resolution. Please be assured that this issue is being treated with the highest priority.

If you’re having trouble connecting to #EmaptaExperience, please use EMAPTA_EXP as a temporary alternative. For any additional support, please reach out to our Onsite Service Desk.

We will provide updates on this advisory as soon as we identify the root cause and have more details to share. Thank you for your patience and understanding.

• Service Impact: Difficulties in Connecting to #EmaptaExperience SSID

23rd April 2025

No incidents reported

22nd April 2025

No incidents reported

21st April 2025

No incidents reported

20th April 2025

No incidents reported

19th April 2025

#SR-199785 |April 19, 2025| SCT Site | Site to Datacenter Circuit Network Maintenance, scheduled 1 month ago

• Event: Event: Network Circuit Reconfiguration

• Schedule: 1 April 19, 2025 (Saturday) | 11:00 AM – 7:00 PM (PHT)

• Schedule: 2 April 20, 2025 (Sunday) | 11:00 AM – 7:00 PM (PHT)

• Activity Details:

Please be advised that one of our service providers will be performing a network configuration update on our circuit. This activity aims to enhance flexibility, security and ensure continued alignment with current network standards.

During the maintenance window, a maximum of 1 hour interruption is expected. However, due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity as we have automatic failovers in place.

• During the failover process, you may experience brief disruptions on any of the following below: • Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. • Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. • Latency Issues – Delays in response times, particularly for real-time applications. • Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity

18th April 2025

No incidents reported

17th April 2025

No incidents reported

16th April 2025

Network and Internet #SR-200612 | April 16, 2025| SFS Site | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Incident: April 16, 2025 (Wednesday) 11:23 PM - 05:34 AM (PHT) - Restored

• Activity Details: We would like to inform you that one of our site-to-datacenter circuit has experienced interruption around 11:23 PM. This has been reported to our provider for further investigation.

• Service Impact: Partial Impact on Internet and Network Connectivity – SFS Site

• Status: Restored

#SR-199786 | April 16-20, 2025 | BET | Annual Preventive Maintenance at BDO Equitable Tower, scheduled 1 month ago

• Event: Power Shutdown

• Scheduled Start: April 16, 2025, Wednesday (08:00 PM) (PHT) • Scheduled End: April 20, 2025, Sunday (3:00 PM) (PHT)

• Activity Details:

Please be advised that the BDO Equitable Tower (BET) Building Administration will be conducting its annual preventive maintenance to inspect electrical systems and perform necessary recalibration of electrical accessories.

During this period, the building’s main power supply will be affected. A backup generator will be available only in 4th floor; however, it will operate only within the window of 6:30 AM to 7:00 PM.

Schedule & Impact:

📅 April 16 (8:00 PM) – April 20 (3:00 PM) Affected Areas: All Floors. Elevator Impact: All elevators will be non-operational during the maintenance period. Power Impact: The backup generator will operate only in 4th Floor from 6:30 AM to 7:00 PM daily. Network Impact: Minimal to no impact is expected on network devices.

For any concerns or assistance, please reach out to:

📌 Facilities and Admin – Available onsite at the 4th floor lobby for in-person assistance. 📌 IT Support – Reach out via email at helpme@emapta.com for technical concerns.

• Service Impact: Building Power Supply

• Status: Completed

15th April 2025

No incidents reported