Some systems are experiencing issues
Scheduled Maintenance
#SR-228205 | June 08, 2025 | NTB | Uninterruptible Power Supply Replacement at Neutrinus Building, Baguio

• Event: New Uninterruptible Power Supply (UPS) Installation

• Schedule: June 08, 2025 (Sunday) | 12:00 PM – 06:00 PM (PHT)

• Activity Details:

Our systems engineering and administration team will be installing a New Uninterruptible Power Supply (UPS) to replace the old UPS to avoid and mitigate the risk of power issues on our networking devices.

During the maintenance window, brief interruptions may occur as we replace the UPS units one at a time to minimize interruption and to ensure network and internet availability. Please note that users connected via Wired/LAN may experience temporary disruptions.

As a temporary alternative, we recommend connecting to #EmaptaExperience Wireless SSID to maintain internet access during the said activity.

For any additional support, please reach out to our Onsite Service Desk.

• Service Impact: Intermittent Internet and Network Connectivity on 4th Floor – NTB Site

Past Incidents

26th May 2025

No incidents reported

25th May 2025

Site Operational Status Ticket# | May 25, 2025 | PNB| Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: May 25, 2025 (Sunday) | 11:07 PM – Ongoing

• Activity Details: Dear Team,

Please be informed that one of our Site to Datacenter Circuit is currently experiencing a service disruption. We are actively coordinating with our circuit provider to gather more details on the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4-5 minute timeframe while automatic failovers/failback activate.

We will provide further updates as soon as we receive more information. Thank you for your patience and understanding.

• Service Impact: Partial Impact on Internet and Network Connectivity – PNB Site

#SR-218986 | May 25, 2025 | BDO, Equitable Tower - Makati | Uninterruptible Power Supply Replacement, scheduled 1 week ago

• Event: New Uninterruptible Power Supply (UPS) Installation

• Schedule: May 25, 2025 (Sunday) | 05:00 PM – 9:00 PM (PHT)

• Activity Details:

Please be informed that the new schedule for the installation of the Uninterruptible Power Supply (UPS) replacement is on May 25, 2025 (Sunday) at 05:00 PM – 9:00 PM. During the maintenance window, brief interruptions may occur as we replace the UPS units one at a time to minimize interruption and to ensure network and internet availability. Please note that users connected via Wired/LAN may experience temporary disruptions. As a temporary alternative, we recommend connecting to #EmaptaExperience Wireless SSID to maintain internet access during the said activity.

• Service Impact: Partial Impact on Network and Internet Connectivity affecting Wired/LAN Connection

• Status: Completed

#SR-221594 | May 25, 2025 | BDO Equitable Tower Building (BET) - Makati | Internal Network Maintenance, scheduled 1 week ago

• Event: Infrastructure Risk Analysis and Mitigation Plan at BDO Equitable Tower (BET)

• Schedule: May 25, 2025 (Sunday) | 05:00 PM – 09:00 PM (PHT)

• Activity Details:

As part of our continued efforts to increase and provide service reliability, there will be a planned Network Failover Testing as part of our Infrastructure Business Continuity Plan (BCP) at our BDO Equitable Tower Office scheduled for May 25, 2025. During the maintenance activity, there will be a series of network and internet interruptions on both LAN/Wire and Wireless connections.

Another advisory will be sent once this maintenance has been completed.

• Service Impact: Intermittent Network and Internet Connectivity for Onsite Users

• Status: Completed

#SR-220757 | May 25, 2025 | IBM Building, Quezon City| Internal Network Maintenance, scheduled 1 week ago

• Event: Wireless Access Point Firmware Upgrade

• Schedule: May 25, 2025 (Sunday) | 08:00 AM – 09:00 AM (PHT)

• Activity Details:

Please be advised that we will be performing a firmware upgrade of our Wireless Access Points to its latest stable version. This maintenance is scheduled for May 25, 2025 (Sunday), from 8:00 AM to 9:00 AM (PHT) at the 12th Floor of IBM Site.

During the maintenance window, wireless connectivity may be temporarily interrupted. If your workstation supports LAN/Wired Connectivity, we recommend using it to minimize disruption.

Should you have any additional questions or require further clarification, please do not hesitate to contact us.

• Service Impact: Intermittent Wi-Fi Connectivity

• Status: Completed

#SR-219010 | May 25, 2025 | SFS Site | Service Provider Network Maintenance, scheduled 1 week ago

• Event: Replacement of Power Module

• Schedule: May 25, 2025 (Sunday) 8:00 AM to 11:00 AM (PHT)

• Activity Details:

We would like to inform you that one of our service providers will be performing a power module replacement. This activity is intended to ensure that their CPE building node remains operational during any power interruptions or maintenance activities within the building.

During the maintenance window, there will be a 3-4hours test window, with an expected disruption of 30 to 45 minutes. However, due to our network's configuration, which includes backup circuits, we expect only a partial impact on the internet and network connectivity, as we have automatic failovers in place.

• Service Impact: Partial network and internet connectivity disruption

• Status: Completed

#SR-220757 |May 25, 2025| IBM Site| Network Advisory: Planned | Internal Network Maintenance, scheduled 1 week ago

• Event: Wireless Access Point Firmware Upgrade

• Schedule: May 25, 2025 (Sunday) | 08:00 AM – 09:00 AM (PHT)

• Activity Details: Please be advised that we will be performing a firmware upgrade of our Wireless Access Points to its latest stable version. This maintenance is scheduled for May 25, 2025 (Sunday), from 8:00 AM to 9:00 AM (PHT) at the 12th Floor of IBM Site.

During the maintenance window, wireless connectivity may be temporarily interrupted. If your workstation supports LAN/Wired Connectivity, we recommend using it to minimize disruption.

• Service Impact: Intermittent Wi-Fi Connectivity – IBM Building, Quezon City

• Status: Completed

24th May 2025

Network and Internet #INC-223162 | May 24, 2025| PNB Building, Makati Site | Unplanned | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: May 24, 2025 (Saturday) | 4:51 AM- 5:18 AM (PHT) - Restored

• Activity Details: We would like to inform you that one of our site-to-datacenter circuit has experienced interruption around 4:51 AM. This has been reported to our provider for further investigation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4-5 minute timeframe while automatic failovers/failback activate.

Further updates shall be provided as soon as they are available.

• Service Impact: Partial Impact on Internet and Network Connectivity – PNB Building, Makati

#SR-221635 | May 24, 2025 | EPC Colombia, Bogota | Internal Network Maintenance, scheduled 1 week ago

• Event: Wireless Access Point Firmware Upgrade

• Schedule: May 24, 2025 (Saturday) | 06:00 PM – 07:00 PM (COL Time)

• Activity Details:

Please be advised that we will be performing a firmware upgrade of our Wireless Access Points to their latest stable version. This maintenance is scheduled for May 24, 2025 (Saturday), from 6:00 PM to 7:00 PM (COL time) at EPC Site.

During the maintenance window, wireless connectivity may be temporarily interrupted. If your workstation supports LAN/Wired Connectivity, we recommend using it to minimize disruption.

Should you have any additional questions or require further clarification, please do not hesitate to contact us.

• Service Impact: Intermittent Wi-Fi Connectivity

• Status: Completed

#SR-220417 | May 24, 2025 | SM Clark Pampanga | Site to Datacenter Circuit Network Maintenance, scheduled 1 week ago

• Event: Service Provider Network Maintenance

• Schedule 1: May 24, 2025 (Saturday) | 11:00 AM – 02:00 PM (PHT)

• Schedule 2: May 24, 2025 (Saturday) | 03:00 PM – 07:00 PM (PHT)

• Activity Details:

Please be informed that one of our service providers will be conducting scheduled network maintenance on Saturday, May 24, 2025. Details are as follows:

Schedule 1: 11:00 AM – 02:00 PM (PHT) Activity: SFP Replacement Expected Network Impact: Partial network interruption Estimated Duration: Up to 2 hours

Schedule 2: 03:00 PM – 07:00 PM (PHT) Activity: Router/modem replacement and transceiver upgrade Expected Network Impact: Partial network interruption Estimated Duration: Up to 4 hours

During the maintenance windows, intermittent network interruptions may occur. However, due to our current network setup, only partial impact is expected as an alternative link is in place to serve as a backup during the activity.

During the failover process, you may experience brief disruptions on any of the following below:

Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. Latency Issues – Delays in response times, particularly for real-time applications. Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity

• Status: Completed

#SR-222063 | May 24, 2025 | PNB Building, Makati | Building Power Maintenance, scheduled 1 week ago

• Event: Emergency Power Shutdown

• Schedule: May 24, 2025 (Saturday) | 10:00 AM – 10:30 AM (PH Time)

• Activity Details:

Please be informed that our Building Administration at PNB will be carrying out emergency power maintenance on Saturday, May 24, 2025.

The purpose of this maintenance is to identify specific offices connected to the building’s existing Uninterruptible Power Supply (UPS). To facilitate this activity, there will be temporary power interruptions affecting all floors of the building.

Maintenance Details:

Duration: Up to 15–30 minutes. Impact: Electricity will be temporarily unavailable. Affected Areas: Entire building (all floors).

We strongly advise all employees to shut down electronic equipment and save any important work ahead of the scheduled downtime to prevent data loss and equipment issues.

For any concerns or assistance, please reach out to: 📌 Facilities and Admin – Available onsite at the 5th floor lobby for in-person assistance. 📌 IT Support – Reach out via email at helpme@emapta.com for technical concerns.

• Service Impact: Building Power Supply - Temporarily Unavailable

• Status: Completed

#SR-221681| May 24, 2025 | JEG Cebu Site | Service Provider Network Maintenance- Emergency, scheduled 1 week ago

• Event: Service Provider Maintenance

• Schedule: May 24, 2025 (Saturday) | 4:00 AM – 6:00 AM (PHT)

• Activity Details:

As part of continued efforts to ensure stability and and reliability of our connection, one of our service providers will be conducting a non-service impacting emergency maintenance activity at their Cebu facility. The activity is designed to prevent potential service interruptions and serves as a permanent resolution to the issues that affected some services in recent weeks.

• Service Impact: Non-Service Impacting

• Status: Completed

23rd May 2025

#SR-211441 | May 23-24, 2025 | All Sites | Service Provider Network Maintenance, scheduled 1 week ago

• Event: Firmware Upgrade on Router’s Devices

• Schedule Start: May 23, 2025 (Friday) | 8:00 PM (PHT) • Schedule End: May 24, 2025 (Saturday) | 11:00 PM (PHT)

• Activity Details:

We would like to inform you that one of our service providers will be conducting a maintenance to upgrade their Routers at Datacenter. This aims to enhance network reliability, ensure compliance, and proactively mitigate potential security vulnerabilities by keeping the infrastructure up to date and fully operational.

There will be no disruption on our circuit; however, a minor increase in latency may be observed as internet traffic will be temporarily rerouted during the maintenance.

• Service Impact: Minimal to no impact on Internet and Connectivity

• Status: Completed

22nd May 2025

#INC-221974 | May 22, 2025 | ASB | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: May 22, 2025 (Thursday) | 12:23 PM – 12:43 PM (PHT) - Restored

• Activity Details:

We would like to inform you that one of our site-to-datacenter circuit has experienced interruption around 12:23 PM (PHT). This has been reported to our provider for further investigation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4-5 minute timeframe while automatic failovers/failback activate.

• Service Impact: Partial Impact on Internet and Network Connectivity

#SR-218793 | May 22-25, 2025 | All PH Sites | Infrastructure Maintenance, scheduled 2 weeks ago

• Event: Quarterly Server OS updates and patching (2025)

• Schedule/s:

• May 22, 2025 (Thursday) 07:00 PM (PHT) • May 23, 2025 (Friday) 07:00 PM (PHT) • May 24, 2025 (Saturday) 07:00 PM (PHT) • May 25, 2025 (Sunday) 08:00 PM (PHT)

• Activity Details:

We would like to inform you about an upcoming server maintenance. This activity involves implementing essential security enhancements and patches of servers.

The activity will be performed in 4 batches: •Batch 1: May 22, 2025 (Thursday) 07:00 PM (PHT) •Batch 2: May 23, 2025 (Friday) 07:00 PM (PHT) •Batch 3: May 24, 2025 (Saturday) 07:00 PM (PHT) •Batch 4: May 25, 2025 (Sunday) 08:00 PM (PHT)

No impact is expected on the end users.

We apologize for any inconvenience this may cause and appreciate your patience as we work to enhance the security of our platform.

• Service Impact: Servers

• Status: Completed

#SR-220494 | May 22, 2025 | IPLC Connectivity Maintenance, scheduled 2 weeks ago

• Event: Relocation of Fiber Optical Cable

• Schedule: May 22, 2025 (Thursday) | 05:59 AM – 12:00 PM (PHT)

• Activity Details:

Please be informed that our service provider will be performing a maintenance to relocate fiber optical cable that host our circuit.

During the maintenance window, a latency increase on the IPLC is expected. However, due to the way our network is setup, traffic should be automatically failover to the VPN connection that will result to a latency increase on VPC/RDP’s.

• Service Impact: Latency Increase on IPLC VPC

• Status: Completed

21st May 2025

Network and Internet #SR-220807 | May 21, 2025 | SM Megatower Ortigas | Unplanned | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: May 21, 2025 (Wednesday) | 2:50 AM - 3:48 PM - Restored

• Activity Details: We would like to inform you that one of our site-to-datacenter circuit has experienced interruption around 2:50 AM . This has been reported to our provider for further investigation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4–5-minute timeframe while automatic failovers/failback activate.

• Service Impact: Partial Impact on Internet and Network Connectivity – SM Megatower Ortigas

• Status: Restored

20th May 2025

No incidents reported

19th May 2025

No incidents reported

18th May 2025

No incidents reported

17th May 2025

Network and Internet #SR-218670 | May 17, 2025 | SCT- SM City Clark | Unplanned | Site to Datacenter Circuit Network Interruption

• Event: Partial Network Connectivity Interruption

• Schedule: May 17, 2025 (Saturday) 12:56 AM-2:32 AM (PHT)- Restored

• Activity Details: We would like to inform you that one of our site-to-datacenter circuit has experienced interruption around 12:56 AM. This has been reported to our provider for further investigation.

Due to the configuration of our network having backup circuits, we expect only partial impact on internet and network connectivity. This may manifest as slow application performance, while remote desktop sessions and VOIP calls may experience intermittent disconnects within a 4–5-minute timeframe while automatic failovers/failback activate.

• Service Impact: Partial Impact on Internet and Network Connectivity – SM Clark SCT site