All systems are operational
Scheduled Maintenance
#SR-235976 | June 15, 2025 | PNB Building - Makati | Site to Datacenter Circuit Network Maintenance

• Event: Circuit Breaker Inspection and Maintenance

• Schedule: June 15, 2025 (Sunday) | 05:00 PM – 06:00 PM (PHT)

• Activity Details:

Due to the recent incidents occurred on one of our site-to-datacenter circuit on PNB Building – Makati. One of our service providers will conduct a maintenance to inspect the circuit breaker of their network equipment inside the building.

During the maintenance window, a maximum of 30-minutes interruption on one of our PNB Site to Datacenter Circuit is expected. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. Latency Issues – Delays in response times, particularly for real-time applications. Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Internet and Network Connectivity Interruption

#SR-231564 | June 16, 2025 | TIP, ASB | Site to Datacenter Circuit Network Maintenance

• Event: Network Device Software Upgrade

• Schedule: June 16, 2025 (Monday) | 12:00 AM – 06:00 AM (PHT)

• Activity Details:

Hi Team,

We would like to inform you that one of our service providers will be performing a software upgrade of their network device to the latest version to enhance network security, performance, and overall system functionality.

During the maintenance window, a maximum of a 2-hour interruption on one of our sites to datacenter circuit is expected. However, due to the configuration of our network having backup circuits, we expect only a partial impact on internet and network connectivity as we have automatic failovers in place.

During the failover process, you may experience brief disruptions on any of the following below:

Choppy or Dropped VoIP Calls – Poor audio quality, delays, or dropped calls on platforms like Zoom, Teams, or Skype. Delayed Emails & Messages – Slower delivery of emails (Outlook, Gmail) and messages in chat apps like Slack and Teams. Latency Issues – Delays in response times, particularly for real-time applications. Remote Desktop (RDP) Disruptions – Lag, session timeouts, or disconnections when accessing remote systems.

• Service Impact: Partial Impact on Internet and Network Connectivity

Past Incidents

27th October 2024

Ticket#SR-87614 | October 27, 2024 | PNB Makati Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at PNB Makati Site

• Schedule : Sunday October 27, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our PNB Makati site from 8:00 AM 6:00 PM on October 27, 2024.

The planned maintenance will focus on PNB traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

26th October 2024

Ticket#SR-87602 | October 26, 2024 | Orient Square Building (OSB) Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at OSB Site

• Schedule : Saturday October 26, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our OSB site from 8:00 AM 6:00 PM on October 26, 2024.

The planned maintenance will focus on OSB traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

19th October 2024

Ticket#SR-87601 | October 19 & 20, 2024 | Saint Francis Square (SFS) Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at SFS Site

• Schedule : October 19 (Saturday) & 20 (Sunday), 2024 | 8:00 AM to 6PM PHT

• Activity Details : This is to confirm that the activity has been completed successfully.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins


• Event : Planned Maintenance Activity | Uplink migration at SFS Site

• Schedule : October 19 (Saturday) & 20 (Sunday), 2024 | 8:00 AM to 6PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our SFS site from 8:00 AM 6:00 PM on October 19 & 20.

The planned maintenance will focus on SFS traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

13th October 2024

Ticket#SR-87617 | October 13, 2024 | The Ignacia Place (TIP) | Uplink Migration, scheduled 8 months ago

• Event : Planned Maintenance Activity | Uplink migration at TIP Site

• Schedule : Sunday October 13, 2024 | 8:00 AM to 6:00 PM PHT - Completed

• Activity Details :

This maintenance activity has been completed as scheduled.

• Service Impact : Possible Wireless & Wired Connectivity Disconnection


• Event : Planned Maintenance Activity | Uplink migration at TIP Site

• Schedule : Sunday October 13, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our TIP site from 8:00 AM 6:00 PM on October 13, 2024.

The planned maintenance will focus on TIP traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Possible Wireless & Wired Connectivity Disconnection

5th October 2024

Ticket#89691 | October 5, 2024| IBM Plaza| System Adjustment on Automatic Transfer Switch (ATS), scheduled 8 months ago

• Event : Planned | Generator Testing with System Adjustment Maintenance at IBM Plaza

• Schedule : October 5, 2024 (Monday) | 10:00 AM to 11:00 AM (PH Time Zone)

• Activity Details :

Our facilities and building admin will be conducting another round of load testing due to a technical adjustment needed on their Automatic Transfer Switch (ATS).

This adjustment is essential and cannot be rescheduled to ensure the system’s long-term reliability and efficiency and prevent any potential futures issues.

During these test, IBM Site may experience minor power fluctuations as they transfer normal power to emergency power, and vice versa. We kindly advise you to remind your employees to save their work before the schedule time of the testing and to avoid any unsaved work until the building has fully returned to normal power.

Additionally: elevator will be temporarily out of service at 9:50 AM during the transfer to emergency Power and will be back shortly afterward. and , once the test is completed the elevator will be out of service again to allow for the transfer back to normal.

Note: This is a non-service impacting on our network devices at IBM site as we have an Uninterruptible Power Supply (UPS) to sustain the power in the event of minor power fluctuations.

• Service Impact : Minor Power Fluctuations at IBM Building

4th October 2024

No incidents reported

3rd October 2024

Network and Internet Ticket#SR-89272 | October 3, 2024| SFS SITE | Site to Datacenter Circuit Network Interruption

• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) – October 6, 2024 (Sunday) | 2:45 PM – Restored and for stability monitoring

• Activity Details Our service provider field engineers have restored our circuit and it’s been monitored UP and stable for more than one (1) hour and subject for further stability monitoring.

Thank you for your patience and understanding.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

This is to update that the fault was found out be due to an ongoing project of MMDA and their contractor at the intersection of Shaw Blvd, San Miguel Ave. and Sheridan St.

Due to the severity, scope of impact, and busy nature of the fault area, ETR has been extended to October 5, 2024 12:00PM.

We greatly appreciate you understanding and continued support on this matter.

We'll keep you posted on significant developments.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

This is to update that the actual fiber optic cable fault happens to fall within Mandaluyong City area which requires work permit for cable laying/replacement activities.

The work permit has been approved already and the restoration activity shall follow. ETR declared is 6:00PM, October 4, 2024.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

We apologize for the delay, as per our service provider that they have conducted isolation and shows a fiber optic cable break 1.8km from the building node facing Garnete CO, their field engineers will deploy on the fault location. No ETR provided yet, but they are addressing this with highest priority.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

Please be informed that one of our Site to Datacenter Circuit currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site

2nd October 2024

No incidents reported

1st October 2024

INFINIVAN Ticket#INC-87968 | October 01, 2024| All Sites| Partial Outage on Network and Internet Connectivity - Restored

• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM (PHT) – October 02, 2024 (Wednesday)| 1:33 AM (PHT) - Restored

• Activity Details :

Please be advised that the affected Datacenter Internet Uplink has been monitored as back up as of 1:33 AM and has remained stable for almost 1 hour.

We are currently coordinating with our service provider to determine the root cause of the issue and are closely monitoring its stability.

Further updates will be provided as soon as they are available

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time) - Ongoing Restoration

• Activity Details :

The field engineers from the third-party service provider will continue the restoration tonight by 9PM. This is due to Makati City ordinance regarding sub-terranean repairs to only proceed during off peak hours to avoid vehicular traffic congestion.

At present, there should be no impact to all Emapta users connecting both onsite or via VPN since redundancy is in place and has more than enough bandwidth catered all internet traffic.

Further updates shall be provided as soon as they are available.

if you encounter any connectivity issues. please send a ticket to helpme@emapta.com

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time) - Ongoing Restoration

• Activity Details :

As per our service provider there was a network outage transmission on the Philippine Backhaul (Makati-Pasig) that failed affecting our circuit. Their third-party provider already deployed field engineers and conducted cable testing at San Agustin St.Cor. H.V Dela Costa Makati, and they measured 24 meters of possible fault. . Further tracing was performed, and the field team found fresh asphalt that needed to be excavated to fix the fiber cut.

Ongoing restoration is being conducted and will continue tonight with ETA of 9PM due to MACEA Policy.

On the other hand, our other available datacenter internet uplink is UP and Stable for internet connection redundancy.

Further updates shall be provided as soon as they are available.

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time)

• Activity Details :

Please be informed that one of our Datacenter Internet Uplink is currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

Further updates shall be provided as soon as they are available.

• Service Impact :
Partial Impact on Internet and Network Connectivity – All Sites

30th September 2024

No incidents reported

29th September 2024

No incidents reported

28th September 2024

#SR-86876 | September 28, 2024 | St Francis Square Site| Fiber Optic Cable Replacement - COMPLETED, scheduled 8 months ago

• Event : Emergency Fiber Optic Cable Replacement at St Francis Square Site

• Schedule : September 28, 2024 (Saturday) | 01:00 PM – 7:30 PM (PH-Time)

• Activity Details : Hi Team,

This is to inform you that the emergency fiber optic cable replacement activity by our service provider at one of the uplinks at the SFS site has been completed successfully. The connection was restored at 7:30 PM, and the affected segment has been permanently fixed.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site - COMPLETED


• Event : Emergency Fiber Optic Cable Replacement at St Francis Square Site

• Schedule : Emergency | Site to Datacenter Circuit Network link restoration

• Activity Details : This is to inform you that there will be an emergency fiber optic cable replacement activity by our service provider at one of the uplinks at SFS site. The subject link is currently up on spare fiber and the affected segment needs to be replaced for permanent fix. Due to the link redundancy in place for this site’s network, we only expect partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site

27th September 2024

No incidents reported

26th September 2024

No incidents reported

25th September 2024

No incidents reported