Some systems are experiencing issues

Past Incidents

27th October 2024

Ticket#SR-87614 | October 27, 2024 | PNB Makati Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at PNB Makati Site

• Schedule : Sunday October 27, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our PNB Makati site from 8:00 AM 6:00 PM on October 27, 2024.

The planned maintenance will focus on PNB traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

26th October 2024

Ticket#SR-87602 | October 26, 2024 | Orient Square Building (OSB) Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at OSB Site

• Schedule : Saturday October 26, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our OSB site from 8:00 AM 6:00 PM on October 26, 2024.

The planned maintenance will focus on OSB traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

19th October 2024

Ticket#SR-87601 | October 19 & 20, 2024 | Saint Francis Square (SFS) Site | Uplink Migration, scheduled 7 months ago

• Event : Planned Maintenance Activity | Uplink migration at SFS Site

• Schedule : October 19 (Saturday) & 20 (Sunday), 2024 | 8:00 AM to 6PM PHT

• Activity Details : This is to confirm that the activity has been completed successfully.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins


• Event : Planned Maintenance Activity | Uplink migration at SFS Site

• Schedule : October 19 (Saturday) & 20 (Sunday), 2024 | 8:00 AM to 6PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our SFS site from 8:00 AM 6:00 PM on October 19 & 20.

The planned maintenance will focus on SFS traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Intermittent Wired & Wireless Connection for 30 mins

Ticket#SR-91213 | October 19, 2024 | SFS Site | Third Party Service Provider Maintenance Activity, scheduled 7 months ago

• Event : Planned Maintenance Activity | Backhaul link migration by service provider

• Schedule : October 19, 2024 (Saturday) | 1:00AM – 3:00AM PHT

• Activity Details : Dear Team,

This is to inform you that there will be a network maintenance activity by one of our Site-to-Data Center providers.

The activity will focus on migrating one of their backhaul links for increase service availability.

No service impact expected for this activity.

• Service Impact : Non-service impacting

Ticket#91214 | October 19, 2024 | Secure Parking RISE DIA | Third Party Service Provider Maintenance Activity, scheduled 7 months ago

• Event : Planned Maintenance Activity | Backhaul link migration by service provider

• Schedule : October 19, 2024 (Saturday) | 1:00AM – 3:00AM PHT

• Activity Details : Dear Team,

This is to inform you that there will be a network maintenance activity by one of our Site-to-Data Center providers. The activity will focus on migrating one of their backhaul links for increase service availability.

No downtime expected, but changes in latency may be experienced during the maintenance window.

• Service Impact : Possible increase in latency within maintenance window

13th October 2024

Ticket#SR-87617 | October 13, 2024 | The Ignacia Place (TIP) | Uplink Migration, scheduled 8 months ago

• Event : Planned Maintenance Activity | Uplink migration at TIP Site

• Schedule : Sunday October 13, 2024 | 8:00 AM to 6:00 PM PHT - Completed

• Activity Details :

This maintenance activity has been completed as scheduled.

• Service Impact : Possible Wireless & Wired Connectivity Disconnection


• Event : Planned Maintenance Activity | Uplink migration at TIP Site

• Schedule : Sunday October 13, 2024 | 8:00 AM to 6:00 PM PHT

• Activity Details :

Please be informed that we will be conducting a planned network maintenance at our TIP site from 8:00 AM 6:00 PM on October 13, 2024.

The planned maintenance will focus on TIP traffic migration from Core switch to SDWAN uplink.

During the maintenance, we are expecting a possible disconnection to the network for both wired & wireless. The impact is isolated per target VLAN during the migration.

• Service Impact : Possible Wireless & Wired Connectivity Disconnection

8th October 2024

Network and Internet Ticket#SR-92081| October 8, 2024 | TIP SITE | Site to Datacenter Circuit Network Interruption - RESTORED

• Event : Partial Outage on Network and Internet Connectivity

• Incident Time/Date : October 08, 2024 (Tuesday) | 09:37 PM (PHT) – October 9, 2024 (Wednesday) | 1:13 AM (PHT) - Restored

• Activity Details : Hi Team,

Please be informed that the affected circuit restored at around 1:13 AM, and we are closely monitoring the connection's stability.

We already requested for an RCA/IR and shall provide to you once made available and upon your request.

• Service Impact : Partial Impact on Internet and Network Connectivity – TIP Site


• Event : Partial Outage on Network and Internet Connectivity

• Incident Time/Date : October 08, 2024 (Tuesday) | 09:37 PM (PHT) - Ongoing

• Activity Details : Hi Team,

Please be informed that one of our Site to Datacenter Circuit currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – TIP Site

7th October 2024

No incidents reported

6th October 2024

No incidents reported

5th October 2024

Ticket#89691 | October 5, 2024| IBM Plaza| System Adjustment on Automatic Transfer Switch (ATS), scheduled 8 months ago

• Event : Planned | Generator Testing with System Adjustment Maintenance at IBM Plaza

• Schedule : October 5, 2024 (Monday) | 10:00 AM to 11:00 AM (PH Time Zone)

• Activity Details :

Our facilities and building admin will be conducting another round of load testing due to a technical adjustment needed on their Automatic Transfer Switch (ATS).

This adjustment is essential and cannot be rescheduled to ensure the system’s long-term reliability and efficiency and prevent any potential futures issues.

During these test, IBM Site may experience minor power fluctuations as they transfer normal power to emergency power, and vice versa. We kindly advise you to remind your employees to save their work before the schedule time of the testing and to avoid any unsaved work until the building has fully returned to normal power.

Additionally: elevator will be temporarily out of service at 9:50 AM during the transfer to emergency Power and will be back shortly afterward. and , once the test is completed the elevator will be out of service again to allow for the transfer back to normal.

Note: This is a non-service impacting on our network devices at IBM site as we have an Uninterruptible Power Supply (UPS) to sustain the power in the event of minor power fluctuations.

• Service Impact : Minor Power Fluctuations at IBM Building

4th October 2024

No incidents reported

3rd October 2024

Network and Internet Ticket#SR-89272 | October 3, 2024| SFS SITE | Site to Datacenter Circuit Network Interruption

• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) – October 6, 2024 (Sunday) | 2:45 PM – Restored and for stability monitoring

• Activity Details Our service provider field engineers have restored our circuit and it’s been monitored UP and stable for more than one (1) hour and subject for further stability monitoring.

Thank you for your patience and understanding.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

This is to update that the fault was found out be due to an ongoing project of MMDA and their contractor at the intersection of Shaw Blvd, San Miguel Ave. and Sheridan St.

Due to the severity, scope of impact, and busy nature of the fault area, ETR has been extended to October 5, 2024 12:00PM.

We greatly appreciate you understanding and continued support on this matter.

We'll keep you posted on significant developments.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

This is to update that the actual fiber optic cable fault happens to fall within Mandaluyong City area which requires work permit for cable laying/replacement activities.

The work permit has been approved already and the restoration activity shall follow. ETR declared is 6:00PM, October 4, 2024.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

We apologize for the delay, as per our service provider that they have conducted isolation and shows a fiber optic cable break 1.8km from the building node facing Garnete CO, their field engineers will deploy on the fault location. No ETR provided yet, but they are addressing this with highest priority.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 3, 2024 (Thursday) | 04:03 AM (PHT) - Ongoing

• Activity Details : Hi Team,

Please be informed that one of our Site to Datacenter Circuit currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

• Service Impact : Partial Impact on Internet and Network Connectivity – SFS Site

2nd October 2024

No incidents reported

1st October 2024

INFINIVAN Ticket#INC-87968 | October 01, 2024| All Sites| Partial Outage on Network and Internet Connectivity - Restored

• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM (PHT) – October 02, 2024 (Wednesday)| 1:33 AM (PHT) - Restored

• Activity Details :

Please be advised that the affected Datacenter Internet Uplink has been monitored as back up as of 1:33 AM and has remained stable for almost 1 hour.

We are currently coordinating with our service provider to determine the root cause of the issue and are closely monitoring its stability.

Further updates will be provided as soon as they are available

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time) - Ongoing Restoration

• Activity Details :

The field engineers from the third-party service provider will continue the restoration tonight by 9PM. This is due to Makati City ordinance regarding sub-terranean repairs to only proceed during off peak hours to avoid vehicular traffic congestion.

At present, there should be no impact to all Emapta users connecting both onsite or via VPN since redundancy is in place and has more than enough bandwidth catered all internet traffic.

Further updates shall be provided as soon as they are available.

if you encounter any connectivity issues. please send a ticket to helpme@emapta.com

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time) - Ongoing Restoration

• Activity Details :

As per our service provider there was a network outage transmission on the Philippine Backhaul (Makati-Pasig) that failed affecting our circuit. Their third-party provider already deployed field engineers and conducted cable testing at San Agustin St.Cor. H.V Dela Costa Makati, and they measured 24 meters of possible fault. . Further tracing was performed, and the field team found fresh asphalt that needed to be excavated to fix the fiber cut.

Ongoing restoration is being conducted and will continue tonight with ETA of 9PM due to MACEA Policy.

On the other hand, our other available datacenter internet uplink is UP and Stable for internet connection redundancy.

Further updates shall be provided as soon as they are available.

• Service Impact : Partial Impact on Internet and Network Connectivity – All Sites


• Event : Partial Outage on Network and Internet Connectivity

• Schedule : October 01, 2024 (Tuesday) | 1:00 AM – On-going (PH-Time)

• Activity Details :

Please be informed that one of our Datacenter Internet Uplink is currently experiencing an outage and we are currently coordinating with our circuit provider to know more about the situation.

Due to the configuration of our network having backup circuits, we expect only partial impact on the internet and network connectivity. This may manifest as slow application performance and intermittent VOIIP calls within a 4–5-minute timeframe while automatic failovers/fallback activate.

Further updates shall be provided as soon as they are available.

• Service Impact :
Partial Impact on Internet and Network Connectivity – All Sites

30th September 2024

No incidents reported

29th September 2024

No incidents reported